PROJECT :
Mumbai – Ahmedabad High Speed Railway (Bullet Train)
CLIENT:
RITES LTD.
SCOPE:
Detailed Topographic Survey using RTK DGPS & Total Stations, Alignment & Bridge Studies, Establishment of DGPS triangulation survey points using DGPS by establishing Master triangle network at about 50 Km interval (minimum 12 hours observation) & smaller triangle network (minimum 3 hours observation) at about 3-5 km interval for the entire 500 Kms stretch of project.