Energy Infrastructure (P) Ltd.

PROJECT :
Kolongchu Hydro – Electric Project (600 Mw) in Bhutan
CLIENT:
Energy Infrastructure (P) Ltd.
SCOPE:
Total Station Traversing, DT Levelling, Longitudinal & Cross-Sectional Survey and Detailed Topographical Survey for Dam site, Reservoir Area, Power House Area, HRT at appropriate scales (1000 to 5000) and contour intervals (1m to 5m) covering a total area of about 250 ha.

 

Comments are closed.

Kolongchu Hydro – Electric Project (600 Mw) in Bhutan
Close Search Window